CAN/CSA Z317.13-07 PDF

CAN/CSA Z317.13-07 PDF

Name:
CAN/CSA Z317.13-07 PDF

Published Date:
10/01/2007

Status:
Active

Description:

Infection Control During Construction, Renovation, and Maintenance of Health Care Facilities, Includes Update No. 1 and Update No. 2 (2008), Update No. 3 (2009)

Publisher:
Canadian Standards Association / National Standard of Canada

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$42
Need Help?
Preface

This is the second edition of CSA Z317.13, Infection control during construction, renovation, and maintenance of health care facilities. It supersedes the previous edition, published in 2003 under the title Infection Control during Construction or Renovation of Health Care Facilities. It is part of a series of Standards related to health care facility engineering and sets forth preventive measures intended to protect patients, staff, and visitors from disease transmission and other health problems, such as allergic reactions, that can be produced by the construction, renovation, or maintenance of health care facilities.

1 Scope

1.1
This Standard describes precautionary and remedial measures for preventing exposure to agents released or augmented because of actions undertaken during health care facility construction, renovation, maintenance, and repair work.

1.2
This Standard is intended to apply to the activities of
(a) architects;
(b) engineers;
(c) commissioning teams;
(d) constructors (as defined in Clause 3);
(e) infection prevention and control personnel;
(f) planning and project managers;
(g) facility managers and maintenance managers;
(h) environmental services staff;
(i) health care staff;
(j) occupational health hygiene professionals; and
(k) operations and maintenance staff involved in any aspect of construction, renovation, or maintenance of health care facilities.

1.3
This Standard has been developed for use during the project specification phase of construction, renovation, and maintenance projects and as a guideline for preventing and controlling fungal and bacterial infections during the implementation of such projects.

1.4
In CSA Standards, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; "may" is used to express an option or that which is permissible within the limits of the standard; and "can" is used to express possibility or capability. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.
Edition : 2nd
File Size : 1 file , 1.6 MB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 56
Product Code(s) : 2418963, 2019817
Published : 10/01/2007

History

CAN/CSA Z317.13:22
Published Date: 03/09/2022
Infection Control During Construction, Renovation, and Maintenance of Health Care Facilities
$67.5
CAN/CSA Z317.13-12
Published Date: 12/01/2012
Infection Control During Construction, Renovation, and Maintenance of Health Care Facilities
$48.9
CAN/CSA Z317.13-07
Published Date: 10/01/2007
Infection Control During Construction, Renovation, and Maintenance of Health Care Facilities, Includes Update No. 1 and Update No. 2 (2008), Update No. 3 (2009)
$42
CAN/CSA Z317.13-03
Published Date: 05/30/2003
Infection Control During Construction or Renovation of Health Care Facilities
$30

Related products

CAN/CSA Z262.4-00 (R2006)
Published Date: 03/01/2000
Ice Hockey Pucks
$14.1
CAN/CSA C22.2 NO. 601.2.19-92(R2001)
Published Date: 03/21/2000
Medical Electrical Equipment - Part 2: Particular Requirements for the Safety of Baby Incubators (Adopted IEC 601-2-19:1990)
$15.9
CAN/CSA E60079-2-02 (R2011)
Published Date: 03/01/2002
Electrical Apparatus for Explosive Gas Atmospheres - Part 2: Pressurized Enclosures "p" (Adopted CEI/IEC 60079-2:2001, fourth edition, 2001-02, with Canadian deviations) | Materiel electrique pour atmospheres explosives gazeuses - Partie 2: Enveloppes a surpression interne (norme CEI/IEC 60079-2
$56.4

Best-Selling Products

RTCA AFS-2
Published Date: 06/11/2020
Feasibility Study Airborne LIDAR for Clear Air Turbulence Detection
$30
RTCA AWP-1
Published Date: 03/18/2014
Detect and Avoid (DAA) White Paper
$45
RTCA AWP-2
Published Date: 03/18/2014
Command and Control (C2) Data Link White Paper
$45
RTCA B-10
Published Date: 1998
Free Flight Action Plan Update 2
$19.8
RTCA B-11
Published Date: 04/02/1998
Free Flight Action Plan Update 1
$19.8
RTCA B-12
Published Date: 08/15/1996
Free Flight Action Plan
$19.8